Compared to traditional decoration,. There are many requirements for the decoration workers (the mason woodworker). Putty glue, base film cover, veneer sticking and other various processes are complicated, the project takes a long time, and the conventional house decoration takes 5 months BALABAlaBAla
However, for many consumers who don't understand the integrated wall, the propaganda of these old growth talks is really not to look at it again. If a person does not do construction work for a long time, there are only a handful of renovation projects that have been experienced in a lifetime. For many consumers, I just saw that you are doing propaganda and good for your products, and you haven't seen anything that is real. How easy is it to install? What is the specific installation process? The decoration team has finished loading my house so soon, will there be any safety problems in the future! ~ Consumers have never been exposed to it. If you want to get in touch, you have to take risks with your own house that will live for decades. Clothes can be tried, and it doesn't cost much if you can't throw it. The price of the house is too high, and I don’t know who wants to be the first to eat crabs.
Then, if you ask the decoration workers in the industry: "How is the integrated wall surface installed?"
The answer is generally like this: "Direct installation!"
What a ghost, the same as the easy to install answer. Direct installation is a different installation method, and what is different from the traditional installation, today Xiaobian said the detailed integrated wall installation process.
Integrated wall tool preparation
Impact drill, electric screwdriver, grinder, bench cutter, hand-held cutter, pistol drill, hole opener, needle-nosed pliers, wrench, hammer, ink fountain, air nail gun, square ruler, tape measure, glue gun, electrical tape, glass Glue, industrial alcohol, triangular trowel, utility knife, gloves, marker, rag (probably these things)
Integrated wall surface construction steps
1. Cleaning and cleaning the house
2, split and use the ink cartridge
3, for integrated keel installation
4, install integrated wall
First top mounting, rear wall and wall mounting
After the wooden structure is finished, the actual wiring is made, and the electrical wiring is reserved.
Water pipe arrangement and floor installation
Precautions:
1. According to the design requirements, the wooden structure is made. The structure of the wooden side has enough points for the fixing of the integrated wall surface. The edge of the wooden side is ensured to be straight, and the two sides of the right angle are as uniform as possible, and the structure is relatively firm.
2. Firstly, the ceiling wall is suspended. The ceiling round lamp panel has its own lamp slot. Before installation, it is evenly positioned according to the number of lamp discs. Before the wall panel is installed, check the flatness of the base layer, and then fix it with neutral silicone structural glue and gun nails.
3. In the process of installation, the integrated wall surface starts from the top. During the process of cutting the plate, the material cut surface must be straight and free of burrs. The higher the cutting saw speed, the less the burr. It is necessary to measure the size of the error between 2mm, otherwise the seam will be extremely irregular and affect the final result.
Finally, attach the final product acceptance criteria
1. The seams of the flat materials are neat;
2, the closing point does not affect the appearance at all;
3. The material is firmly fixed, and there is no void in the material at the wall;
4, the color is reasonable;
5. There is no leakage in the internal insulation layer;
6, the wave plate docking complete without burrs;
7. The fold is at right angles, smooth and beautiful.